Estimating Direct Labor Hours And Cost Plus Margin

Question

A company which makes sophisticated financial calculators has designed a new casing for its product which requires a different finish to the previous casing because the material type is a recently developed synthetic material and much stronger and more scratch-resistant than the previous plastic material used for the product casing. It is the first time the workforce will have to work with this new synthetic material. The design department selected a team of experienced workers to manufacture a trial batch of 10 calculators using the new material. After due consideration, management has decided to assume an 80% learning curve for production of the product, which is given below:

X (batches of 100units)

Y(%)

X (hours)

Y(%)

1

100

8

51.2

2

80

9

49.3

3

70.2

10

47.7

4

64.0

12

44.9

5

59.6

14

42.8

6

56.2

20

38.1

7

53.4

40

30.5

Also, a task analysis of the processes used to produce this first batch of calculators indicated the following direct inputs and average costs-per-calculatere Direct material £300 Direct labour £200 Each direct labour hour costs £90

Required:

a) Estimate how many direct labour hours will be required to produce the fourth batch of calculators.

b) What is the prime cost per calculator for the fourth batch.

c) Assume after completing and selling the first 4 batches, the company receives an order from a wholesaler for a batch of 100 calculators. How many direct labour hours will be required to produce this batch of calculators?

d) If the company uses a cost plus margin approach to price its products, what is the price per calculator for the batch in part (c) if the company, in addition to material and labour costs also incurs variable overheads which are 75% of direct labour cost.

e) Critically assess some of the typical purposes for which learning curve estimations may be used by management accounting department.

 

Summary

The question belongs to Accounting and it discusses about estimating direct labor hours, cost plus margin and learning curve estimations used by management accounting.

Total Word Count 394

Download Full Solution

Comments

  • HWA
    Rasha

    this is a very good website

  • HWA
    maani

    I have 50 questions for the same test your page is showing only 28

  • HWA
    joeanne

    hi can you please help or guide me to answer my assignments. thanks

  • HWA
    joeanne

    hi can anyone help or guide me to my assignments. thanks

  • HWA
    Monik


  • HWA
    Cristina

    This solution is perfect ...thanks

  • HWA
    Janete

    Hello Allison,I love the 2nd image that you did! I also, had never heard of SumoPaint, is something that I will have to exolpre a bit! I understand completely the 52 (or so) youtube videos that you probably watched. Sometimes they have what you want, sometimes they don't! However, it is always satisfying when you are able to produce something that you have taught yourself. Great job!Debra 0 likes

  • HWA
    Sandeep

    Perfect bank of solution. 

  • HWA
    Oxana

    great !

  • HWA
    Paul Brandon-Fritzius

    thanks for the quick response. the solution looks good. :)

  • HWA
    tina Johnson

    thnx for the answer. it was perfect. just the way i wanted it. 

  • HWA
    Giuseppe

    works fine.